des.

Monday, 6 August 2012

Facade Matrix

Jisoo's matrix


Jiwon's matrix

Salva's Matrix


Posted by des at 13:01
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Process

  • ▼  2012 (76)
    • ►  October (8)
    • ►  September (9)
    • ▼  August (33)
      • Transmaterial-9,10,11
      • Matrix
      • Stairs sectional
      • Stairs and the hotel
      • Stairs CNC - assembly documentation
      • Dystopian stairs
      • Utopian ground stairs
      • Utopian underground stairs
      • Stairs development
      • Between two floors
      • Waiheke site section
      • Waiheke site review and human experience
      • Salva's modelling task
      • Jisoo's modelling task
      • Jiwon's modelling task
      • Studio Focus Four Overview
      • Peer Review 3
      • 2 vehicles between 2 worlds final
      • Flying lantern
      • Non flying vehicle
      • Flying vehicle
      • Transmaterial-6,7,8
      • Vehicle idea brainstorm
      • Hotel idea brainstorm
      • Harmonizer -staring point
      • Capture the movement
      • Research on flying machines
      • Studio Focus Three Overview
      • Peer Review 2
      • Facade Matrix
      • Transmaterial-3,4,5
      • 2 walls between 2 surfaces final
      • Development towards final
    • ►  July (26)

About Me

des
jisoo jung jiwon won salva shah
View my complete profile

About the Blog

Simple theme. Theme images by gaffera. Powered by Blogger.